Product Description
C P Bath Fittings
This project proposes to manufacture chrome plated sanitary fittings eg., Bib cocks, Pillar cocks, stop cocks, Bottle trap, Basin waste, Basin mixer, Angular stop cock, showers, Introducer, and ceramic Disc with Quarter-turn fittings in single lever, etc. These are products of ordinary to sophisticated types. The Govt. of India has reserved this project for SSI Units in order to protect entrepreneurs from competition with large scale manufacturers. All the plant and machinery required for the project are indigenously available. These products are used as fittings in any Sanitary system. There is a large demand of chrome-plated bathroom fittings in all modern houses, offices, Hotels, Railway Stations, Aerodromes and so on all over India. Besides conventional C.P. bathroom fittings, the project also plans to manufacture new concept items used as sanitary fittings, e.g. ceramic colour coated fittings, in brass metal. The modern houses prefer good looking chrome plated sanitary fittings. Sanitary fitting are mainly the fittings or items required in the sanitary system of a building or apartment or water supply system and include the above mentioned items of different types. Various sizes, types and grades of sanitary fittings are produced in the country to suit the various tastes. For example. Bib cocks are available in five nominal sizes.
Cost Estimation
Plant Capacity 1667 Nos./Day
Land & Building (Area 1012 sq.mt.) Rs. 1.02 Cr.
Plant & Machinery Rs. 28 Lacs
W.C. for 1 Months Rs. 48 Lacs
Total Capital Investment Rs. 1.92 Cr.
Rate of Return 45%
Break Even Point 48%
Note: ITI can modify the Capacity and Project Cost based on your requirement.
Contents of the Project Reports
Introduction
Uses and Applications
Properties
Market Position
Present Manufacturers
Detailed Process of Manufacture
Formulations
B.I.S. Specifications
Process Flow Sheet Diagram, Plant Layout,
Cost Economics with Profitability Analysis
Capacity
Land & Building Requirements with Rates
List & Details of Plant and Machinery with their Costs
Raw Materials Details/List and Costs
Power & Water Requirements
Labour/Staff Requirements
Utilities and Overheads
Total Capital Investment
Turnover
Cost of Production
Break Even Point
Profitability
Land Man Ratio
Suppliers of Plant & Machineries and Raw Materials
Cash Flow Statement
Repayment Schedule
Interest Chart
Depreciation Chart
Projected Balance Sheet for 5 Years etc.