Product Description
Psa Based Nitrogen Generator [Eiri-1219]The pressure swing adsorption processes for the continuous and regenerative purification of air and gases have been well established since the discovery of the basic process over fifty years ago. Recent advances in the adsorption process have resulted in improved separation efficiencies and lower energy consumption. Purity requirements for clean, dry air have become more stringent in recent years to meet the increased demands of industry and laboratories. Thirty years ago, pure air was required to have a moisture dew point of 400C or lower and less than 1 ppmv hydrocarbon content (as methane). The levels were gradually lowered to -760C dew point and less than 0.5 ppmv total hydrocarbon content. With advances in technology, the purity requirements were reduced to less than 1 ppbv for semiconductor photolithography applications, fuel cell development, automobile emissions testing, pharmaceutical manufacturing and other critical applications. Recently, the manufacturers of lithographic systems have required extremely dry air, less than -960C dew point, and contamination levels lower than 1 pptv. In addition to the removal of water vapor and hydrocarbons, pure air is defined as being free of acid forming gases such as hydrogen sulfide, sulfur dioxide and nitrogen oxides, and free of base gases such as ammonia. Contaminants are very detrimental in many areas where compressed air is use. In breathing air systems, contaminants are an irritant in the human respiratory system and can even be a health hazard. In pharmaceutical manufacturing processes, products are subject to contamination by the compressed air used in conveying and mixing solutions. In lithographic systems, the optical lenses are clouded by the adsorption of hydrocarbons and the surfaces are permanently etched by acid forming gases and ammonia even at low concentration levels.
Cost Estimation
Plant Capacity 45000 lb/Day
Land & Building (Area 5000 sq.mt.) Rs. 5.35 Cr.
Plant & Machinery Rs. 5.20 Cr.
W.C. for 2 Months Rs. 3.13 Cr.
Total Capital Investment Rs. Cr.
Rate of Return 33%
Break Even Point 69%
Note: ITI can modify the Capacity and Project Cost based on your requirement.
Contents of the Project Reports
Introduction
Uses and Applications
Properties
Market Position
Present Manufacturers
Detailed Process of Manufacture
Formulations
B.I.S. Specifications
Process Flow Sheet Diagram, Plant Layout,
Cost Economics with Profitability Analysis
Capacity
Land & Building Requirements with Rates
List & Details of Plant and Machinery with their Costs
Raw Materials Details/List and Costs
Power & Water Requirements
Labour/Staff Requirements
Utilities and Overheads
Total Capital Investment
Turnover
Cost of Production
Break Even Point
Profitability
Land Man Ratio
Suppliers of Plant & Machineries and Raw Materials
Cash Flow Statement
Repayment Schedule
Interest Chart
Depreciation Chart
Projected Balance Sheet for 5 Years etc.