Pipes and tubes find use in almost all the industries/services in one way or the other. Automobile vehicles use metallic pipes, including steel pipes, of a large variety. Gas/water/liquids transporting pipes are spread everywhere. Irrigation, petroleum products, sewerage, chemicals transportation pipes and those used in mines, public water supply networks, are well known. Hydraulic piping may be divided into (i) rigid & (ii) flexible classes. Rigid piping of iron & steel is either seamless or welded type. Pipes have specified end-threading pipe-fittings in the piping net-work. The following common tube sizes, their bend=radii & other pertinent data, are taken care of by pipe manufacturers. E R W processes uses tremendous amount of localized heating to bring the material to plastic state and above when it is just ready to melt. The ERW process joins two separate parts by passage of heavy current across the joint. Due to great electrical resistance of the circuit, heat generates locally at the joint surfaces which, when brought in contact at approximately the melting temperature, joint together to give a strong welded joint. Either AC or DC current can be used but the use of AC-current is felt convenient. It is so because the required high current can be supplied at a low voltage through a suitable transformer, if AC=source is used. High current & proper "push-up" forces are the essential requirements in electric resistance welding. Power requirement, for welding a given cross-section, varies widely with time-interval of current application to produce the weld.
Cost Estimation
Plant Capacity 7.80 MT./Day
Land & Building (Area 3000 sq.mt.) Rs. 1.68 Cr.
Plant & Machinery Rs. 89 Lacs
W.C. for 2 Months Rs. 2.15 Cr.
Total Capital Investment Rs. 4.94 Cr.
Rate of Return 21%
Break Even Point 64%
Note: ITI can modify the Capacity and Project Cost based on your requirement.
Contents of the Project Reports
Introduction
Uses and Applications
Properties
Market Position
Present Manufacturers
Detailed Process of Manufacture
Formulations
B.I.S. Specifications
Process Flow Sheet Diagram, Plant Layout,
Cost Economics with Profitability Analysis
Capacity
Land & Building Requirements with Rates
List & Details of Plant and Machinery with their Costs
Raw Materials Details/List and Costs
Power & Water Requirements
Labour/Staff Requirements
Utilities and Overheads
Total Capital Investment
Turnover
Cost of Production
Break Even Point
Profitability
Land Man Ratio
Suppliers of Plant & Machineries and Raw Materials
Cash Flow Statement
Repayment Schedule
Interest Chart
Depreciation Chart